Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Last revisionBoth sides next revision
student:scrumj:help [2021/03/18 14:06] bernstdhstudent:scrumj:help [2022/03/21 09:42] bernstdh
Line 14: Line 14:
 A sprint backlog can be created using the [[ https://docs.google.com/spreadsheets/d/1bI35ElgIrMCnwfhddW3lgvfDJKuZNDEJL4yiaKWd6ig/copy | scrumj link ]] (which actually makes a copy of an empty sprint backlog).  This document should then be shared with all members of the team (including the product owner). A sprint backlog can be created using the [[ https://docs.google.com/spreadsheets/d/1bI35ElgIrMCnwfhddW3lgvfDJKuZNDEJL4yiaKWd6ig/copy | scrumj link ]] (which actually makes a copy of an empty sprint backlog).  This document should then be shared with all members of the team (including the product owner).
  
-When a sprint backlog is initially copied it contains just an Overview page and an Assignments page. The first things a user should do after copying a sprint is to re-name it (in the usual way), set the start/end dates (by clicking on <key>scrumj</key>+<key>Set dates...</key>), and add **all** of the team members to the Assignments page by entering their names in the cells to the right of the header/label. (Note: You cannot add team members after you have added a story, so add all of them now.) +When a sprint backlog is initially copied it contains just an Overview page and an Assignments page. The first things a user should do after copying a sprint is to re-name it (in the usual way), set the start/end dates (by clicking on <key>scrumj</key>+<key>Set dates...</key>), and add **all** of the team members to the Assignments page by entering their names in the cells to the right of the header/label. (Notes1. The start date should be the date the sprint actually starts, not the date of the planning meeting. 2. You cannot add team members after you have added a story, so add all of them now.) 
  
 Note that the first time you use the scrumj menu you may be asked to give a script attached to the document permission to run. You must give the script (which is named ''%%scrumj.gs%%'') permission to do so. Note that the first time you use the scrumj menu you may be asked to give a script attached to the document permission to run. You must give the script (which is named ''%%scrumj.gs%%'') permission to do so.