Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionLast revisionBoth sides next revision | ||
student:vivifyscrum:practices [2019/03/05 10:48] – removed bernstdh | student:vivifyscrum:practices [2019/03/05 11:42] – bernstdh | ||
---|---|---|---|
Line 1: | Line 1: | ||
+ | ===== Vivify Scrum Practices and Conventions ===== | ||
+ | Vivify Scrum uses some non-standard terminology (e.g., it does not use the term " | ||
+ | |||
+ | - Each sprintable backlog item must be have an "item type" of " | ||
+ | - Every sprintable backlog item must have a single " | ||
+ | - Most sprintable backlog items should have " | ||
+ | - Every " | ||
+ | - A " | ||
+ | - The team must have an " | ||
+ | - Stories must not have " | ||
+ | - The team member that is the " | ||
+ | - The team must have a " | ||
+ | - Tasks must not have " | ||
+ | - Epics can (and should) be included in the product backlog. Since there is no specific item type for epics, they must be classified as " | ||
+ | - Since Vivify Scrum does not allow multiple levels of " | ||
+ | |||
+ | Help is available on the [[student: |