- | ==== Working with the Product | + | ==== Working with the Backlog |
- | + | ||
- | The product backlog will typically be the left-most column of the board and will be labeled " | + | |
=== Adding a Product Backlog Item === | === Adding a Product Backlog Item === | ||
- | To add a product backlog item (PBI): | + | The product backlog will typically be the left-most column of the board and will be labeled " |
- Hover the mouse over the bottom of the " | - Hover the mouse over the bottom of the " | ||
Line 22: | Line 20: | ||
- Enter a title for the item. | - Enter a title for the item. | ||
- Click on < | - Click on < | ||
+ | |||
+ | After you have added the item you should set its type by clicking on the the drop-down menu on the top left of the card. | ||
| | ||
=== Entering Value and Effort Estimates === | === Entering Value and Effort Estimates === | ||
- | To provide an effort estimate for a PBI: | + | To provide an effort estimate for a backlog item: |
- Click on {{student: | - Click on {{student: | ||
Line 37: | Line 37: | ||
To add a subitem to an item (e.g., a task to a story): | To add a subitem to an item (e.g., a task to a story): | ||
- | - Click on {{student: | + | - Click on {{student: |
- Pull down to " | - Pull down to " | ||
- Enter a title. | - Enter a title. | ||
- Click on < | - Click on < | ||
+ | |||
+ | Subitems will have a {{student: | ||
+ | |||
+ | === Adding Checklists === | ||
+ | |||
+ | To add a checklist to an item (of any kind): | ||
+ | |||
+ | - Click on {{student: | ||
+ | - Pull down to "+ Add Checklist" | ||
+ | - Enter a description of the checklist item. | ||
+ | - Press < | ||
+ | - Continue until all of the checklist items have been entered. | ||
+ | |||
+ | Note that VivifyScrum allows an item to have multiple checklists though it is not [[ student: | ||
+ | |||
+ | === Adding Assignees and Reviewers === | ||
+ | |||
+ | To add assignees and/or reviewers to an item (of any kind): | ||
+ | |||
+ | - Click on {{student: | ||
+ | - Select the appropriate tab. | ||
+ | - Search for the appropriate individual. | ||
+ | |||
+ | Note that VivifyScrum allows story to have assignees and a task to have reviewers though it is not [[ student: | ||
+ | |||
Line 48: | Line 73: | ||
- On the right side of the board (midway down the board), click on < | - On the right side of the board (midway down the board), click on < | ||
- Chose which PBIs you want to do in this sprint and drag them from the PBI column to the Sprint # column (i.e., to the sprint backlog). | - Chose which PBIs you want to do in this sprint and drag them from the PBI column to the Sprint # column (i.e., to the sprint backlog). | ||
- | - Make sure that each feature in the sprint backlog | + | - Add a checklist to each feature |
- | - Decompose each feature (sprintable story) in the sprint backlog into sub-items by clicking on {{student: | + | - Decompose each feature (sprintable story) in the sprint backlog into subitems, where each subitem corresponds |
- | - Enter an effort estimate for each task. While it is a good idea to estimate stories in story points and tasks in hours, | + | - Enter an effort estimate for each task. While it is a good idea to estimate stories in story points and tasks in hours, |
- Add items, such as overhead items, to the sprint backlog. | - Add items, such as overhead items, to the sprint backlog. | ||
- Have team members take responsibility for tasks (and record the information in the tasks by editing the " | - Have team members take responsibility for tasks (and record the information in the tasks by editing the " |