Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| student:scrumj:help [2020/04/07 10:56] – bernstdh | student:scrumj:help [2025/08/21 16:29] (current) – bernstdh | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| - | |||
| ====User Interaction==== | ====User Interaction==== | ||
| The user interface for scrumj looks something like the following: | The user interface for scrumj looks something like the following: | ||
| - | {{student: | + | {{student: |
| Headings/ | Headings/ | ||
| Line 12: | Line 11: | ||
| ====Getting Started==== | ====Getting Started==== | ||
| - | A sprint backlog can be created using the [[ https:// | + | A sprint backlog can be created using the [[ https:// |
| - | When a sprint backlog is initially copied it contains just an Overview page and an Assignments page. The first things a user should do after copying a sprint is to re-name it (in the usual way), set the start/end dates (by clicking on < | + | When a sprint backlog is initially copied it contains just an Overview page and an Assignments page. The first things a user should do after copying a sprint is to re-name it (in the usual way), set the start/end dates (by clicking on < |
| - | A story can be added to a sprint by clicking on < | + | Note that the first time you use the scrumj menu you may be asked to give a script attached to the document permission to run. You must give the script (which is named '' |
| + | |||
| + | A story can be added to a sprint by clicking on < | ||
| + | |||
| + | The tabs for the stories are color-coded as follows. | ||
| ^ Color ^ Meaning ^ | ^ Color ^ Meaning ^ | ||
| - | | <html>< | + | | < |
| - | | <html>< | + | | < |
| - | | <html>< | + | | < |
| - | | <html>< | + | | < |
| - | | <html>< | + | | < |
| The name of the active tab is rendered in green. | The name of the active tab is rendered in green. | ||
| Line 32: | Line 35: | ||
| The Overview page provides an overview of the sprint and the progress that has been made thus far. It looks something like the following: | The Overview page provides an overview of the sprint and the progress that has been made thus far. It looks something like the following: | ||
| - | {{student: | + | {{student: |
| Line 48: | Line 51: | ||
| The Assignments page provides a summary of the various work items that each team member has volunteered for. (The term " | The Assignments page provides a summary of the various work items that each team member has volunteered for. (The term " | ||
| - | {{student: | + | {{student: |
| The task summary and acceptance criteria summary contain statistics about all of the stories in the sprint (except those that have been deactivated). It is presented for each team member individually. | The task summary and acceptance criteria summary contain statistics about all of the stories in the sprint (except those that have been deactivated). It is presented for each team member individually. | ||
| Line 60: | Line 63: | ||
| A story page looks something like the following: | A story page looks something like the following: | ||
| - | {{student: | + | {{student: |
| The story description can be entered "in as-I want-so" | The story description can be entered "in as-I want-so" | ||
| Line 68: | Line 71: | ||
| A task or acceptance criteria will always be added at the end of the respective area and will be numbered accordingly. The user must enter the description and assignee (and effort for tasks). When a task is completed or an acceptance criteria is confirmed, the user should click on the corresponding status checkbox. The date will be entered automatically and, if permissions have been granted, the name of the person who clicked the status box will also be entered. | A task or acceptance criteria will always be added at the end of the respective area and will be numbered accordingly. The user must enter the description and assignee (and effort for tasks). When a task is completed or an acceptance criteria is confirmed, the user should click on the corresponding status checkbox. The date will be entered automatically and, if permissions have been granted, the name of the person who clicked the status box will also be entered. | ||
| - | The information in the effort | + | The information in the effort |
| ====User Interaction==== | ====User Interaction==== | ||
| - | | ||
| A task can be removed by clicking on < | A task can be removed by clicking on < | ||
